August 7th, 2024 — Fire demolished a six story wood frame apartment building under construction at 41st and Collingwood Street. The construction crane at the site collapsed over 41st Avenue and crushed a house on the south side of the street.


August 7th, 2024 — Fire demolished a six story wood frame apartment building under construction at 41st and Collingwood Street. The construction crane at the site collapsed over 41st Avenue and crushed a house on the south side of the street.


February 2nd, 2024 — Making a video on Ambleside Beach.
January 17th, 2024 — Chaldecott Park baseball diamond covered with snow.
January 17th, 2024 — Tobogganing down a hill in the Jericho Grounds next to 4th Avenue.
January 17th, 2024 — Coffee run in the snow on Dunbar Street.
January 12th, 2024 — Frost on the inside of windows in minus 15 degree weather.
December 10th, 2023 — In the 4800 block of 32nd Avenue.
November 3rd, 2023 — In the 1200 block of Hornby Street.
August 1st, 2023 — Moving Henry Hudson School along Cornwall Street to Kits Beach where it will be put on a barge and taken to North Vancouver.
April 27th, 2023 — The emergency department overflow waiting area at UBC hospital.