January 3rd, 2022 — Construction on Columbia Street at 5th Avenue.
Jericho pier
January13th, 2022 — Logs thrown onto Jericho Pier by winter storms combined with a king tide.
Education Road
December 7th, 2021 — The theatre production building on Education Road, UBC.
Sidewalk closed
January 3rd, 2022 — Construction of the Broadway Subway at Broadway and Quebec Street.
Argo cafe
January 3rd, 2022 — The Argo Cafe on Ontario Street.
Tree 1, car 0
January 6th, 2022 — A tree knocked down by wet snow blocks West 26th Avenue.
Frosty two wheeler
January 6th, 2022 — It wasn’t the best day to bicycle to work.
Half steps
January 6th, 2022 — Steps half cleared of snow on the west side of Vancouver.
Park in the snow
January 4th, 2022 — People walking through Pacific Spirit Park in the snow.
Bus in the snow
January 4th, 2022 — Transit bus stuck in the snow on King Edward Blvd at Dunbar Street.
You must be logged in to post a comment.