June 20th, 2005 — Condo towers from the Burrard Street Bridge.
Coffee sacks
January 21st, 2022 — Coffee sacks covering the ground in an area of Pacific Spirit Park that is being restored.
Left over snow
February 11th, 2017 — Left over snow on the west side of Vancouver.
Old and new
January 3rd, 2022 — Construction on Columbia Street at 5th Avenue.
Jericho pier
January13th, 2022 — Logs thrown onto Jericho Pier by winter storms combined with a king tide.
Education Road
December 7th, 2021 — The theatre production building on Education Road, UBC.
Sidewalk closed
January 3rd, 2022 — Construction of the Broadway Subway at Broadway and Quebec Street.
Argo cafe
January 3rd, 2022 — The Argo Cafe on Ontario Street.
Tree 1, car 0
January 6th, 2022 — A tree knocked down by wet snow blocks West 26th Avenue.
Frosty two wheeler
January 6th, 2022 — It wasn’t the best day to bicycle to work.